Category Archives: Bathroom repairs

lagniappeservices

February 25, 2015

lagniappeservices's avatar

The original tub was plastic and had a higher sidewall than a standard tub. The owner decided he wanted a mid-grade steel tub.
We had to remove one course of tile to to remove the cracked tub. We then added concrete to raise the tub, installed a ledger to support the tub and then reinstalled wall tile that looks very similar to the original.

Original

Job photos.